Well, didnt make it before the kids started school, so I will have to use the kitchen while school is in, no big deal
..countertops are in, sink is in, refrigerator, and cooktop and oven this weekend
I plan on starting my drawers first though, to get me some much needed storage. I have a few questions on that ..
First one is simple, any pros and/or cons for 5/8 vs. 1/2?
At first, I wanted to use Baltic birch, but since it is really fussy with cutting dovetails, and I went through all this work anyways, I want to use solid maple.
Second question, I wanted to use full sides all around, but that means assembling my box before spray, or do most of you just leave the rear of the drawer short, and slide in the bottom after finishing?
Third question what to use for the finish shellac, GF Poly, I have a half gallon left over SW Kem Aqua Plus
Attached are a couple pics right after the countertop installers left.
20150903_215857.jpeg20150903_215916.jpeg
I plan on starting my drawers first though, to get me some much needed storage. I have a few questions on that ..
First one is simple, any pros and/or cons for 5/8 vs. 1/2?
At first, I wanted to use Baltic birch, but since it is really fussy with cutting dovetails, and I went through all this work anyways, I want to use solid maple.
Second question, I wanted to use full sides all around, but that means assembling my box before spray, or do most of you just leave the rear of the drawer short, and slide in the bottom after finishing?
Third question what to use for the finish shellac, GF Poly, I have a half gallon left over SW Kem Aqua Plus
Attached are a couple pics right after the countertop installers left.
20150903_215857.jpeg20150903_215916.jpeg
Kitchen is still coming along .
Aucun commentaire:
Enregistrer un commentaire